Pre-application Householder development
|
£210
£290 with Site Visit
|
Advice on development within the curtilage of a residential property (non-listed), with the provision of 1 piece of written advice with up to a 1 hours meeting if required.
|
Additional advice and meeting (if required) following submission of additional detail £210 or £290 with Site visit
|
Pre-application Advertisement Consent
|
£210
£290 with Site Visit
|
Advice on display of advertisement, with the provision of 1 piece of written advice with up to a 1 hours meeting if required.
|
Additional advice and meeting (if required) following submission of additional detail £210 or £290 with Site visit
|
Pre-application Small Minor 1-2 Dwellings or non-residential floor space up to 499 sqm, telecommunications, Lawful development Certificate Advice and changes of use except dwellings, where there is no operational development)
|
£450
£530 with Site Visit
|
Advice on development Proposal considering the detail of the scheme with the provision of 1 piece of written advice with up to a 1 hours meeting if required.
|
Additional advice and meeting (if required) following submission of additional detail £210 or £290 with Site visit
|
Pre-application Minor Development (between 3 – 9 dwellings or non-residential floor space between 500 – 999 sqm or a site area up to 1 Ha)
|
£640 + additional £210 per dwelling over 5 dwellings
£720 with Site Visit + additional £210 per dwelling over 5 dwellings
|
Advice on development Proposal considering the detail of the scheme with the provision of 1 piece of written advice with up to a 1 hours meeting if required.
|
Additional advice and meeting (if required) following submission of additional detail £520 + £80 for a site visit
Listed Building advice for Listed Building if required
|
Pre-application
Small Scale Majors (up to 30 dwellings or Non-Residential floor space between 1000 – 4999 sqm or a site area between 1 – 2 Ha)
|
£2500
|
two meetings plus a written response. If more than two meetings are required the pre-app will be the subject of a specific PPA requested at commencement.
|
Alternatively a PPA commencement fee £720 + agreed PPA fee should a PPA be requested at commencement rather than pay £2500 for the basic service
£1250 per additional meeting
Listed Building advise for Listed Building
|
Pre-application
Large Majors (Over 31 dwellings or Non-Residential floor space over 5000sqm or a site area over 2 ha. All renewable energy proposals unless a domestic scale and all development that requires an EIA)
|
£720
|
Fee to agree a PPA to establish the scope of the pre-application service through a PPA.
|
Agreed PPA fee
for an additional £1780 at the commencement can also include advise on the principle of development
|
Pre-application Listed Building Minor works not requiring a separate Planning Application (effecting only one Listed Building)
Work such as window replacement minor work to structure/ alterations in discrete areas
|
£210
£290 with Site Visit
|
Advice on minor works associated with a Listed Building or within the curtilage of a Listed Building, Provision of 1 piece of written advice with up to a 1 hours meeting or on site if a site visit is selected (If an application is received but considered to be beyond the scope of this service it will be altered to the large Listed Building fee with the additional fee required before it is progressed by the case officer)
|
Additional advice and meeting (if required) following submission of additional detail £210 or £290 with Site visit
|
Pre-application Listed Building Consent substantial works and alterations to a building or development within the curtilage, Barn conversions
|
£450 up to 2 dwellings or under 500 sqm of commercial floor space
£530 with Site Visit
For scheme involving 3 or more units or over 500 sqm of commercial floor space the pre-application fee will also be charged
|
Advice on development within the curtilage or effecting one or more Listed Buildings, Provision of 1 piece of written advice with up to a 1 hours meeting if required.
|
Additional advice and meeting (if required) following submission of additional detail £210 + £80 for a site visit or conversion in to a PPA with bespoke fee
Relevant Planning Pre-application fee for scheme involving 3 or more units or over 500 sqm of commercial floor space
|
Pre-application for condition discharge applications
|
£150 per condition
|
Consideration of detail which is required to discharge a planning condition. Including a meeting (if required either virtually or in the Council Offices) and one piece of written advice which includes engagement with the consultee who recommended the condition
|
£150 per additional consideration of plans, material or detail required by the condition, per condition.
£80 for a site visit
|
Pre-application for Tree Preservation Orders and trees in
Conservation Areas
|
£210
£290
with Site Visit
|
Preliminary pre-application advice on works that may be
considered appropriate for the maintenance and wellbeing of a protected tree or trees. Including a meeting and one piece of written advice
|
Additional advice and meeting (if required) following submission of additional detail £210 or £290 with Site visit
|
100% Affordable Housing schemes
|
No Charge
|
Advice on development proposal considering the detail of the scheme with the provision of 1 piece of written advice with up to 1 hours meeting if required.
|
Additional pre-application will be subject to the development of a PPA for the scheme as per the charging schedule above
|
Facilities for the disabled
|
No Charge
|
Advice on development Proposal considering the detail of the scheme with the provision of 1 piece of written advice with up to 1 hours meeting if required.
|
Additional pre-application will be subject to the charging schedule above with a 50% discount or the development of a PPA for the scheme
|
Parish/Town Council
|
No Charge
|
Advice on development Proposal considering the detail of the scheme with the provision of 1 piece of written advice with up to 1 hours meeting if required.
|
Additional pre-application will be subject to the charging schedule above or the development of a PPA for the scheme
|